Skip to main content
2019
Green Roof Case Study

Deansgate - Castlefield Metrolink Station

Size: 
150m² - 300m²
Duration: 
4-8 weeks
Client background: 

Transport for Greater Manchester and SimpsonHaugh Architects worked on creating a 'distinctive tram stop within a landscaped park setting that enhances the passenger experience' that involved the incorporation of green infrastructure on several elevations.

Scope of works: 

As well as the stunning 188m2 living wall, we supplied our sedum and wildflower GrufeTiles to create the living carpet between the tram tracks at the Deansgate stop.