Skip to main content
2015
Living Wall Case Study

Eaton House School

Size: 
25m² - 150m²
Duration: 
1 week
A Living Wall at the Eaton House School
An educational living wall at Eaton
An ANS living wall installed at Eaton
Client background: 

Eaton House Schools are a group of schools in London.

Scope of works: 

ANS Living Wall installed externally to a school building above a green roof.

Case Study Location

Eaton House The Manor School
London
United Kingdom