2012
Living Wall Case Study
Olympics Aquatic Centre
Size:
300m² +
Duration:
12+ weeks





Client background:
The London Olympic Games 2012 gripped the nation – and the world – from the preparation to the closing ceremony. Huge changes took place across London, including greening the frontage at the Olympic Aquatic Centre!
Scope of works:
ANS were honoured to provide a centrepiece for the aquatics stadium in time for the launch of the Games.
Case Study Location
Olympic Park
London
E20 2ZQ
A great project from start to finish; thanks everyone!