Skip to main content
2012
Living Wall Case Study

Olympics Aquatic Centre

Size: 
300m² +
Duration: 
12+ weeks
Client background: 

The London Olympic Games 2012 gripped the nation – and the world – from the preparation to the closing ceremony. Huge changes took place across London and ANS were honoured to provide a centrepiece for the aquatics stadium in time for the launch of the Games.

Scope of works: 

The London Olympic Games 2012 gripped the nation – and the world – from the preparation to the closing ceremony. Huge changes took place across London and ANS were honoured to provide a centrepiece for the aquatics stadium in time for the launch of the Games.

Case Study Location

Olympic Park
London
E20 2ZQ
United Kingdom
A great project from start to finish; thanks everyone!