2011
Living Wall Case Study
Triodos Bank
Size:
1m² - 25m²
Duration:
1 week




Client background:
Triodos Bank has a large building in Bristol, this includes an internal green wall.
Scope of works:
The living wall was installed by ANS Global with a full green coverage and some splashes of colour from other plant types.
Case Study Location
Deanery Road
Avon
Bristol
BS1 5AS