Skip to main content
2012
Living Wall Case Study

Waverton Street

Size: 
1m² - 25m²
Duration: 
1 week
Client background: 

When dealing with limited garden space, this client wanted to include a framed green wall for maximum impact with minimum use of space.

Scope of works: 

The ANS Living Wall system worked well inside the frame on this design and makes a great feature of this small courtyard.